West Country Arenas’ installation process for equine arena, menage and gallop construction:
Free Site Visit and Survey
To discuss your equestrian and surface requirements and provide a free quotation.
Planning Issues
West Country Arenas will help advise on your planning process.
All work is carried out by West Country Arenas
We do not use sub-contractors.
Site Preparation
Careful removal of topsoil is carried out for re-use around the Arena.
Drainage Requirements
Area cut to gradient depending on drainage requirements.
Good Drainage means preparing proper channels, piping and application of lots of stone drainage material before we even begin to consider your surface.
Base Layer and Drainage Membrane
Each base layer is carefully levelled and compressed; including the all important membrane which is carefully applied to ensure the drainage system is sealed and protected from contamination from your surface.
Boards, Posts and Rails
Installation of pressure treated weather edged retaining boards (8×2”), post and rail. 5ft 3” from surface level, 3 rail with posts 6ft apart, 12ft gates are hung in accordance with customer preference.
Arena Surface
Your chosen equestrian arena surface is applied onto the prepared surface and levelled for use.
Landscaping
The area is finally landscaped, and your riding arena is ready for show jumping, dressage, galloping or whatever its intended use.
Guaranteed Work
West Country Arenas work is guaranteed to the highest standards and comes with a 3 year warranty.